Please ensure Javascript is enabled for purposes of website accessibility

Upgrading of Lot 1: Wajir- Tarbaj (A13) Road (55 km) including Tarbaj spur road (2 km), Axle Load Control Station and Civil Works associated with installing a Fibre Optic Cable along the Samatar- Wajir- Tarbaj Road Section (124 km):