Staff Mail       |     Intranet

config

TENDER NOTICE

The Kenya National Highways Authority (KeNHA) is a State Corporation established under the Kenya Roads Act, 2007 with the responsibility for Management, Development, Rehabilitation and Maintenance of National Trunk Roads.

The Authority hereby invites bids from eligible bidders for provision of 1st and 2nd Quarters Financial Year 2021-2022 Maintenance of various roads to be funded through the Road Maintenance Levy Fund as listed below: -

Download << Long Tender Notice >> for more information

ADDENDUM NO. 1: ALL TENDERS

ADDENDUM NO. 2: ALL TENDERS - Extension of Time

CLARIFICATION NO. 1: ALL TENDERS

CLARIFICATION NO. 3: ALL TENDERS

CLARIFICATION NO. 4 - ALL TENDERS

CLARIFICATION NO. 7 - ALL TENDERS

NOTE: CLICK ON THE TENDER NUMBER TO DOWNLOAD THE BID DOCUMENT

No. Tender No. Tender Description NCA Registration Required Eligibility Region Engineers’ Estimate
(Kshs.)
Inspection & Purchase of Tender Documents and Email & telephone Contacts of Regional Directors
  ADDENDUM NO. 1 - ALL TENDERS
 1

KeNHA/R1/231/2021

Addendum No. 1

Addendum No. 2

Addendum No. 3

Addendum No. 6

Performance Based Contract for the Maintenance of Bondo – Usenge - Osieko (B10) Road 1 or 2 All Nyanza 644,173,527.38 KeNHA, Nyanza Regional Office, P.O. Box 317 – 40100, MoPW Building, Busia Road, Kisumu
061-2300098/0733283167/0708711137
Email:This email address is being protected from spambots. You need JavaScript enabled to view it.
 2

KeNHA/R1/232/2021

Addendum No. 1

Clarification No. 2

Addendum No. 4

Performance Based Contract for the Maintenance of Rodi Kopany - Rangwe-Oyugis (B144) Road 3, 4 or 5 All Nyanza 129,997,012.40
 3

KeNHA/R1/233/2021

Addendum No. 1

Construction of Kwa Francis Box Culvert at Km 20+100 along Lolgorian – Kehancha (B1) Road 5 or 6 Youth Nyanza 25,821,292.00
 4

KeNHA/R1/234/2021

Addendum No. 1

Construction of Nyarango Box Culvert at Km 11+800 along Awendo – Mariwa - Kilgoris (B134) Road 5 or 6 Women Nyanza 25,475,363.40
 5

KeNHA/R1/235/2021

Addendum No. 1

Contract for the Maintenance of Regional Structures in Nyanza Region 5 or 6 All Nyanza 15,818,572.00
 6

KeNHA/R1/236/2021

Addendum No. 3

Framework Contract for Handling of Emergencies in Nyanza Region 5 or 6 Youth Nyanza 50,000,000.00
 7

KeNHA/R2/88/2021

Addendum No. 1

Clarification No. 2

Performance Based Contract for Maintenance of JCT A1 (Chavakali)- Jn B12 Chepsonoi (B128) Road 1, 2 or 3 All Western 467,273,943.40 KeNHA Western Region
495-50100 Kakamega.
056-2030089 / 0712305770
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
 8

KeNHA/R2/89/2021

Addendum No. 3

Performance Based Contract for Maintenance of Senende - Serem - Kipsigak (B127) Road 1, 2 or 3 All Western 516,373,550.96
 9 KeNHA/R2/90/2021 Routine Maintenance and Spot Improvement of Rwatama-Sirisia (B13) Road 5, 6 or 7 PWD Western 20,378,785.75
 10

KeNHA/R2/91/2021

Addendum No. 1

Routine Maintenance and Spot Improvement of Kakamega Hospital –Chepsonoi (B12) Road 6, 7 or 8 Women Western 17,931,349.62
 11 KeNHA/R2/92/2021 Routine Maintenance and Spot Improvement of Kapsakwony-Kitale (B13) Road 5, 6 or 7 Youth Western 23,077,398.15
 12 KeNHA/R2/93/2021 Construction of Box Culvert on Papaton - Endebess (Kisawai) (B123) Road 6, 7 or 8 Youth Western 19,310,208.19
 13

KeNHA/R2/94/2021

Addendum No. 1

Construction of Box Culvert (Km 20) - Kaiboi – Turbo (B123) Road 6, 7 or 8 PWD Western 19,010,236.60
 14 KeNHA/R2/95/2021 Framework Contract for Handling Emergencies in Western Region 4, 5 or 6 All Western 50,000,000
 15

KeNHA/R2/96/2021

Addendum No. 1

Clarification No. 1

Addendum No. 4

Performance Based Contract for Maintenance of Busia – Malaba (B13) Road 1, 2 or 3 All Western 363,828,069.57
 16

KeNHA/R3/324/2021

Addendum No. 1

Addendum No. 4

Clarification No. 2

Performance Based Contract for Maintenance of JCT A8 (Maili Tisa) - Kitale (B14) Road

NCA 1 or 2 All North Rift 604,916,223.48

KeNHA, North Rift Regional Office
P.O.BOX 2000-30100

ELDORET.
0777-127531
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

 17

KeNHA/R3/325/2021

Addendum No. 3

Performance Based Contract for Maintenance of A1 JN (Kitale) - Sibanga - Kachibora (B15) Road NCA 3, 4 or 5 Women North Rift 197,997,908.73
 18

KeNHA/R3/344/2021

Addendum No. 3

Performance Based Contract for the Maintenance of Lodwar-Lokitaung Junction (A1) Road NCA 2, 3 or 4 All North Rift 205,141,362.94
 19 KeNHA/R3/327/2021 Routine Maintenance and Spot Improvement of Nginyang' - CB Baringo [Kapedo] (A10) Road NCA 6, 7 or 8 PWD North Rift 15,805,936.72
 20

KeNHA/R3/328/2021

Clarification No. 2

Routine Maintenance and Spot Improvement of CB Baringo [Kapedo] - JCT C134 Lokwamothing (A10) Road NCA 5, 6 or 7 Women North Rift 50,000,405.12
 21 KeNHA/R3/329/2021 Routine Maintenance and Spot Improvement of JCT C134 Lokwamothing - Ngamia 1 Oil Fields (Amosing) (A10) Road NCA 6, 7 or 8 Women North Rift 20,405,046.72
 22 KeNHA/R3/330/2021 Routine Maintenance and Spot Improvement of Kapenguria (Konyao) – Alale (B70) Road NCA 6, 7 or 8 PWD North Rift 20,000,562.26
 23 KeNHA/R3/331/2021 Routine Maintenance and Spot Improvement of Alale – Kauriong (B70) Road

NCA 6, 7 or 8

Women North Rift 15,797,549.92
 24 KeNHA/R3/332/2021 Routine Maintenance and Spot Improvement of Kauriong – Loima (B70) Road NCA 6, 7 or 8 Youth North Rift 15,750,004.42
 25 KeNHA/R3/333/2021 Routine Maintenance and Spot Improvement of Loima - JCT A1 (Lodwar) (B70) Road

NCA 6, 7 or 8

PWD North Rift 15,750,786.26
 26 KeNHA/R3/334/2021 Routine Maintenance and Spot Improvement of Jct A1 , Lokichogio-Lokitaung (B71) Road NCA 5, 6 or 7 Women North Rift 40,545,897.60
 27 KeNHA/R3/335/2021 Routine Maintenance and Spot Improvement of Lokitaung-Kibish (B71) Road NCA 5, 6 or 7 Youth North Rift 35,169,797.00
 28 KeNHA/R3/336/2021 Routine Maintenance and Spot Improvement of Kalokol-Lokitaung- Kachoda (B72) Road

NCA 6, 7 or 8

PWD North Rift 15,750,415.06
 29 KeNHA/R3/337/2021 Routine Maintenance and Spot Improvement of A1 Lodwar-Nakalei-A4 South Horr (B73) Road

NCA 5, 6 or 7

Youth North Rift 31,002,265.00
 30 KeNHA/R3/338/2021 Routine Maintenance and Spot Improvement of Makutano-Kalem (B117) Road

NCA 6, 7 or 8

Youth North Rift 11,215,824.24
 31 KeNHA/R3/339/2021 Routine Maintenance and Spot Improvement of Lokwamosing -Amaler –Lomut (B118) Road NCA 6, 7 or 8 Women North Rift 10,168,892.34
 32 KeNHA/R3/340/2021 Routine Maintenance and Spot Improvement of Lowereng-Todonyang (B119) Road NCA 6, 7 or 8 PWD North Rift 9,086,107.74
 33 KeNHA/R3/341/2021 Routine Maintenance and Spot Improvement of Kapcherop-Naiberi-Kapchorua-Torongo (B122) Road

NCA 6, 7 or 8

Youth North Rift 7,556,507.38
 34

KeNHA/R3/326/2021

Addendum No. 3

Clarification No. 2

Performance Based Contract for Maintenance of Eldoret-Nyaru-Kapkayo-Tenges (B124) Road NCA 1, 2 or 3 Women North Rift 412,140,310.48
 35 KeNHA/R3/342/2021 Routine Maintenance and Spot Improvement of Kondoo-Ainabkoi-Kamwosor-Flourspar (B125) Road

NCA 6, 7 or 8

PWD North Rift 9,268,039.24
 36 KeNHA/R3/343/2021 Routine Maintenance and Spot Improvement of Biretwo-Arror-Tot (B126) Road NCA 5, 6 or 7 Women North Rift 27,193,033.20
 37 KeNHA/R4/256/2021 Performance Based Contract for Maintenance of Kericho – Kaplong (B6) Road 1, 2 or 3 All South Rift                          397,361,589.38             KeNHA South Rift Region
Ministry of Works Building, Nakuru.
P.O.BOX 17752-20100 NAKURU.
0785663508 Email:This email address is being protected from spambots. You need JavaScript enabled to view it.
 38 KeNHA/R4/257/2021 Performance Based Contract for Maintenance of Ololunga – Lamek (B1) Road 4, 5 or 6 PWD South Rift              89,213,546.80
 39 KeNHA/R4/258/2021 Performance Based Contract for Maintenance of Ewaso Ngiro – Narusura (B19) Road 4, 5 or 6 Women South Rift              98,071,244.72
 40

KeNHA/R4/259/2021

Addendum No. 1

Routine Maintenance and Spot Improvement of Lamek – Aitong (B1) Road 5, 6 or 7 Women South Rift              34,104,317.26
 41 KeNHA/R4/260/2021 Routine Maintenance and Spot Improvement of Aitong - Mara River (B1) Road 4, 5 or 6 PWD South Rift              61,412,039.66
 42 KeNHA/R4/261/2021 Routine Maintenance and Spot Improvement of Mara River – Lolgorian (B1) Road 4, 5 or 6 Youth South Rift              72,258,434.64
43  KeNHA/R4/262/2021 Routine Maintenance and Spot Improvement of Narusura – Morijo (B19) Road 5, 6 or 7 Youth South Rift              38,158,119.96
 44 KeNHA/R4/263/2021 Routine Maintenance and Spot Improvement of Morijo – Oloiborto (B19) Road 5, 6 or 7 Women South Rift 39,047,317.96
 45 KeNHA/R4/264/2021 Framework Contract for Handling Emergencies in South Rift Region 5, 6 or 7 Youth South Rift 24,000,000.00
 46 KeNHA/R5/156/2021 Routine Maintenance and Spot Improvement of Magumu – Njabini (B110) Road 5, 6 or 7 Youth Nairobi 48,402,025.44

KeNHA Nairobi Regional Office, Machakos Road Industrial Area

P. O. Box 200-00507,

020-2632237/020-2642475

Nairobi, Kenya

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

 47 KeNHA/R5/157/2021 Routine Maintenance and Spot Improvement of Elangata - Kajiado A2 Jn (B51) Road 4, 5 or 6 PWD Nairobi 76,499,858.64
 48 KeNHA/R5/158/2021 Routine Maintenance and Spot Improvement of Isinya - Konza (Jn A8) (B50) Road 3,4 or 5 Youth Nairobi 135,779,890.80
 49 KeNHA/R5/159/2021 Routine Maintenance and Spot Improvement of Ruiru – Tatu City – Kiambu – Raini – Ndenderu (B115) Road 3, 4 or 5 Women Nairobi 104,997,678.40
 50

KeNHA/R5/160/2021

Clarification No. 2

Routine Maintenance and Spot Improvement of Magadi Exit Gate(West) - Oloiborto (CB Narok) (B19) Road 4,5 or 6 All Nairobi 66,345,570.70
 51

KeNHA/R6/203/2021

Performance Based Contract for Maintenance of Dundori - Olkalou (B20) Road

4, 5 & 6

All Central

76,248,447.20

KeNHA Central Region Boardroom;
Ministry of Public Works Offices, Nyeri
061-2034419/0704000 133
Email:This email address is being protected from spambots. You need JavaScript enabled to view it.

 52

KeNHA/R6/204/2021

Addendum No. 3

Addendum No. 4

Performance Based Contract for Maintenance of Olkalou – Mawingo (B20) Road

1, 2 & 3

All Central

361,344,292.00

 53

KeNHA/R6/205/2021

Clarification No. 2

Addendum No. 3

Performance Based Contract for Maintenance of Mawingo - Njambini   (B20) Road

3, 4 & 5

All Central

148,350,776.00

 54

KeNHA/R6/206/2021

Clarification No. 2

Performance Based Contract for Maintenance of Sagana - Kagio - B24 Kianjiru   (B25) Road

4, 5 & 6

Women Central

93,431,983.78

 55

KeNHA/R6/207/2021

Clarification No. 2

Routine Maintenance and Spot improvement of Gwa Kung'u – Mutara (B22) Road

5, 6 & 7

Youth Central

21,014,260.72

 56

KeNHA/R6/208/2021

Routine Maintenance and Spot improvement of Mutara - Doldol Turnoff (B22) Road

5, 6 & 7

PWD Central

21,218,188.72

 57

KeNHA/R6/209/2021

Addendum No. 3

Routine Maintenance and Spot improvement of Doldol Turnoff – Nanyuki (B22) Road

3, 4 & 5

Women

Central

137,719,276.82

 58

KeNHA/R6/202/2021

Clarification No. 2

Routine Maintenance & Spot Improvement of Gituya - Kabati (B113) Road,

5, 6 & 7

Youth

Central

21,695,353.95

 59

KeNHA/R7/478/2021

Addendum No. 3

Addendum No. 4

Performance Based Contract for Maintenance of JN A9 Meru -Kangeta - Laari- Mutuati – JN A10 Kachuru (JN A9 Meru -Kangeta - Laari- Mutuati – kamweline)(B66) Road 1,2 or 3 All Upper Eastern 380,269,100.40

KeNHA, Upper Eastern regional Offices, P.O.BOX 325 -60300 ISIOLO

Isiolo Town 0645352074

Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

 60

KeNHA/R7/479/2021

Addendum No. 1

Addendum No. 4

Performance Based Contract for Maintenance of Meru - Mikinduri - Maua - Kangeta (B102) Road 1 or 2 All Upper Eastern 561,343,274.42
 61

KeNHA/R7/480/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Maralal-Marti) (A4) Road 5, 6 or 7 PWD Upper Eastern 37,702,280.85
 62

KeNHA/R7/481/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Marti - Baragoi) (A4) Road 5,6 or 7 All Upper Eastern 31,184,156.75
 63

KeNHA/R7/482/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Baragoi-South Horr-Sarima) (A4) Road

5,6 or 7

Women Upper Eastern 28,899,744.10
 64

KeNHA/R7/483/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Sarimo-Loiyangalani) (A4) Road

5,6or7

All Upper Eastern 36,715,377.50
 65

KeNHA/R7/484/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Loiyangalani - Gass) (A4) Road

5,6 or 7

All Upper Eastern 39,930,959.56
 66

KeNHA/R7/485/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Gass - North Horr) (A4) Road

5,6 or 7

All Upper Eastern 24,127,760.75
 67

KeNHA/R7/486/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (North Horr - Elbaso -Km 80) (A4) Road

5,6 or 7

Women Upper Eastern 41,098,569.16
 68

KeNHA/R7/487/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (Km 80 – Daradhe AP Camp – JN B76 Buluk (A4) Road

5,6or7

All Upper Eastern 35,999,665.00
 69

KeNHA/R7/488/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Maralal-North Horr - JN Buluk – Illeret – Police Border Post (JN B76 Bulluk - Ileret - Police Border Post ) (A4) Road

5,6 or 7

All Upper Eastern 41,999,995.30
 70

KeNHA/R7/489/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of JN A4 Buluk – Forolle – Turbi (JN A4 Buluk – Sabarai – Saru) (B76) Road

5, 6 or 7

All Upper Eastern 29,999,070.30
 71

KeNHA/R7/490/2021

 Addendum No. 3

Routine Maintenance and Spot Improvement of JN A4 Buluk – Forolle – Turbi (Saru - Dukana - Elhadi - Km 200) (B76) Road

5,6or7

Women Upper Eastern 35,999,781.16
 72

KeNHA/R7/491/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of JN A2 Laisamis –Merti - Hadado (Laisamis - Koya - Kom KWS) (B82) Road

5,6 or 7

Youth Upper Eastern 49,144,676.00
 73

KeNHA/R7/492/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of JN A2 Laisamis –Merti - Hadado (Kom KWS - Merti) (B82) Road

5,6 or 7

All Upper Eastern 36,128,490.00
 74

KeNHA/R7/493/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of JN A2 Laisamis –Merti – Hadado (Merti-Basa-Hadado) (B83) Road 4,5 or 6 Youth Upper Eastern 54,512,233.80
 75

KeNHA/R7/494/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Arba Jahan - Shull Manyatta - Marsabit (Arba Jahan - Km 72) (B81) Road 6,7 or 8 Women Upper Eastern 11,410,992.50
 76

KeNHA/R7/495/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Arba Jahan - Shull Manyatta - Marsabit (Km 72 - Shull Manyatta - Marsabit) (B81) Road

5,6 or 7

Women Upper Eastern 38,954,072.93
 77

KeNHA/R7/496/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of North Horr-Kalacha-JN Maikona – Marsabit (North Horr-Kalacha) (B75) Road

5,6 or 7

All Upper Eastern 25,240,751.50
 78

KeNHA/R7/497/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Horr-Kalacha-JN Maikona – Marsabit (Kalacha - JN Maikona) (B75) Road

5,6 or 7

All Upper Eastern 25,617,440.58
 79

KeNHA/R7/498/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of Horr-Kalacha-JN Maikona – Marsabit (JN Maikona-Segel (B75) Road

5,6 or 7

PWD Upper Eastern 25,034,300.46
80 

KeNHA/R7/499/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of JN A9 Meru -Kangeta - Laari- Mutuati – JN A10 Kachuru (Kamweline – Kachuru) (B66) Road

5,6 or 7

Youth Upper Eastern 21,119,902.50
 81

KeNHA/R7/500/2021

Addendum No. 3

Routine Maintenance and Spot Improvement of JN A4 South Horr (Nursery) - Jn Civicon Road - Ngurunit - JN A2 Laisamis (JN A4 South Horr (Nursery) - Jn Civicon Road - Illuat - Ngurunit - Jn Civicon Road – Km 110) (B74) Road

5,6 or 7

All Upper Eastern 35,997,139.63
 82

KeNHA/R7/501/2021

 Addendum No. 3

Routine Maintenance and Spot Improvement of JN B82 Merti – Garbatulla – Danyere (Garbatulla-Danyere) (B83) Road 4,5 or 6 All Upper Eastern 50,064,454.50
 83

KeNHA/R7/502/2021

 Addendum No. 3

Routine Maintenance and Spot Improvement of Buna – Moyale (A13) Road

5,6 or 7

All Upper Eastern 40,393,004.54
 84

KeNHA/R8/233/2021

Performance Based Contract for Maintenance of Kangonde – Kabati (A9) Road 5, 6 or 7 All Lower Eastern 44,258,964.80 KeNHA, Lower Eastern Regional Office, P.O. Box 2603-90100, MACHAKOS, Opposite Machakos School
044-2020287
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
 85

KeNHA/R8/238/2021

Routine Maintenance and Spot Improvement of Kimana - Chyulu Gate (B54) Road 6, 7 or 8 Women Lower Eastern 19,992,356.40
 86

KeNHA/R8/239/2021

Routine Maintenance and Spot Improvement of Wote - Athi River (B61) Road

6, 7 or 8

PWD Lower Eastern 19,995,952.40
 87

KeNHA/R8/240/2021

Routine Maintenance and Spot Improvement of Athi River – Kitui (B61) Road

6, 7 or 8

All Lower Eastern 13,394,972.40
 88

KeNHA/R8/241/2021

Routine Maintenance and Spot Improvement of Kangundo – Mwala (B63) Road

6, 7 or 8

Youth Lower Eastern 13,332,796.40
 89

KeNHA/R8/242/2021

Routine Maintenance and Spot Improvement of Kamuwongo – Ciangera (B64) Road 5, 6 or 7 Women Lower Eastern 35,861,690.00
 90

KeNHA/R8/243/2021

Routine Maintenance and Spot Improvement of Lukenya - Joska - Kantafu - Matuu ma Mwitu (B67) Road 5, 6 or 7 All Lower Eastern 20,615,833.20
 91

KeNHA/R8/244/2021

Routine Maintenance and Spot Improvement of Matuu ma Mwitu - Kilimambogo - Makuyu (B67) Road

6, 7 or 8

All Lower Eastern 18,538,574.80
 92

KeNHA/R8/245/2021

Routine Maintenance and Spot Improvement of Waldena – Chifiri (B83) Road

6, 7 or 8

All Lower Eastern 14,340,766.80
 93

KeNHA/R8/246/2021

Routine Maintenance and Spot Improvement of Chifiri – Bangali (B83) Road 5, 6 or 7 All Lower Eastern 27,078,541.20
 94

KeNHA/R8/247/2021

Routine Maintenance and Spot Improvement of Mwitika – Twambui (B87) Road 5, 6 or 7 All Lower Eastern 26,354,330.00
 95

KeNHA/R8/248/2021

Routine Maintenance and Spot Improvement of Twambui – Chifiri (B87) Road

6, 7 or 8

Youth Lower Eastern 19,999,432.40
 96

KeNHA/R8/249/2021

Routine Maintenance and Spot Improvement of Mutomo - South Kitui N.R Gate (B88) Road

6, 7 or 8

All Lower Eastern 19,953,067.20
 97

KeNHA/R8/250/2021

Routine Maintenance and Spot Improvement of South Kitui N.R Gate - Kone Kalite (B88) Road

6, 7 or 8

All Lower Eastern 13,794,940.40
 98

KeNHA/R8/251/2021

Routine Maintenance and Spot Improvement of Kone Kalite - Waldena (B88) Road

6, 7 or 8

All Lower Eastern 13,481,206.80
 99

KeNHA/R8/252/2021

Routine Maintenance and Spot Improvement of Wamunyu – Itangini (B104) Road

6, 7 or 8

All Lower Eastern 13,756,614.00
 100

KeNHA/R8/253/2021

Clarification No. 2

Routine Maintenance and Spot Improvement of Ukia – Emali (B107) Road 5, 6 or 7 Women Lower Eastern 24,608,704.00
 101

KeNHA/R8/254/2021

Construction of Chifiri Box Culvert on Waldena – Bangali (B83) Road

6, 7 or 8

PWD Lower Eastern 15,839,897.44
102 

KeNHA/R9/82/2021

Routine Maintenance and Spot improvement of Kone Kalite- Sala Gate (B83) Road 4,5 or 6 PWD Coast 60,009,053.30 KeNHA, Coast Region, 2nd Floor, MOR&PW Main Building, Mahindi Road off Shimanzi Road P.O. Box 84254-80100 Mombasa
020-2653702/30700344891 Email:This email address is being protected from spambots. You need JavaScript enabled to view it.
 103

KeNHA/R9/83/2021

Routine Maintenance and Spot improvement of Lunga Lunga - Kinango- Marere (B92) Road

4,5 or 6 Youth Coast 54,118,848.80
 104

KeNHA/R10/194/2021

Routine Maintenance and Spot Improvement of Modika (Junct C81) – Hagalbul (A3) Road NCA 6, 7 or 8 Youth North Eastern Region 18,502,504.60 KeNHA,
North Eastern Regional Office, 1st Floor, Ministry of Roads &Public Works Building, Off Kismayu Road, Garissa
P.O.BOX 41 – 70100 GARISSA. 0727461040
This email address is being protected from spambots. You need JavaScript enabled to view it.
 105

KeNHA/R10/195/2021

Routine Maintenance and Spot Improvement of Hagalbul – Daadab (A3) Road

NCA 6, 7 or 8

PWD North Eastern Region 17,865,618.20
 106

KeNHA/R10/196/2021

Routine Maintenance and Spot Improvement of Daadab- Kulan (A3) Road

NCA 6, 7 or 8

Women North Eastern Region 15,405,084.20
 107

KeNHA/R10/197/2021

Routine Maintenance and Spot Improvement of Kulan – Liboi (A3) Road

NCA 6, 7 or 8

All North Eastern Region 10,856,162.76
 108

KeNHA/R10/198/2021

Routine Maintenance and Spot Improvement of Hola-Waldena (B88) Road

NCA 6,7 or 8

Youth North Eastern Region 15,336,996.84
 109

KeNHA/R10/199/2021

Routine Maintenance and Spot Improvement of Modogashe - Habaswein (A13) Road

NCA 6, 7 or 8

PWD North Eastern Region 15,940,918.36
 110

KeNHA/R10/200/2021

Addendum No. 1

Routine Maintenance and Spot Improvement of Habaswein - Samatar (junct C116) (A13) Road NCA 5, 6 or 7 Youth North Eastern Region 30,960,092.60
 111

KeNHA/R10/201/2021

Routine Maintenance and Spot Improvement of Junct (C116) Samatar – Bojiyare (A13) Road

NCA 4, 5 or 6

Women North Eastern Region 51,383,674.36
 112

KeNHA/R10/202/2021

Addendum No. 1

Routine Maintenance and Spot Improvement of Bojiyare-Wajir (A13) Road

NCA 4, 5 or 6

Women North Eastern Region 50,348,685.24
 113

KeNHA/R10/203/2021

Routine Maintenance and Spot Improvement of Wajir - Tarbaj - Wargadud Centre (A13) Road

NCA 5, 6 or 7

All North Eastern Region 31,232,101.00
 114

KeNHA/R10/204/2021

Routine Maintenance and Spot Improvement of Wargadud Centre (Wajir) - Kotulo (Mandera) (A13) Road

NCA 5, 6 or 7

PWD North Eastern Region 30,386,769.56
 115

KeNHA/R10/205/2021

Routine Maintenance and Spot Improvement of Kotulo (Mandera) - Dabasit Centre (A13) Road NCA 5, 6 or 7 PWD North Eastern Region 21,810,724.84
 116

KeNHA/R10/206/2021

Routine Maintenance and Spot Improvement of Dabasit Centre – Elwak (A13) Road NCA 5, 6 or 7 All North Eastern Region 20,778,674.00
 117

KeNHA/R10/207/2021

Routine Maintenance and Spot Improvement of Rhamu-Quimbiso (A13) Road

NCA 6, 7 or 8

PWD North Eastern Region 15,586,711.78
 118

KeNHA/R10/208/2021

Routine Maintenance and Spot Improvement of Quimbiso – Mandera (A13) Road

NCA 5, 6 or 7

Women North Eastern Region 31,816,341.23
119 

KeNHA/R10/209/2021

Addendum No. 1

Routine Maintenance and Spot Improvement of Lafey-Mandera (B96) Road

NCA 5, 6 or 7

All North Eastern Region 40,794,474.00
 120

KeNHA/R10/210/2021

Routine Maintenance and Spot Improvement of Moyale- Banisa (B80) Road

NCA 5, 6 or 7

Youth North Eastern Region 20,629,493.65
 121

KeNHA/R10/211/2021

Routine Maintenance and Spot Improvement of Banisa – Rhamu (B80) Road

NCA 5, 6 or 7

Women North Eastern Region 22,219,228.43
 122

KeNHA/R10/212/2021

Routine Maintenance and Spot Improvement of Dabel - Buna (A14) Road

NCA 5, 6 or 7

Youth North Eastern Region 25,537,238.76
 123

KeNHA/R10/213/2021

Routine Maintenance and Spot Improvement of Buna - Junct U E 50008 (Eldas) (A14) Road NCA 6, 7 or 8 All North Eastern Region 18,195,076.76
 124

KeNHA/R10/214/2021

Routine Maintenance and Spot Improvement of Junct U E 5008 (Eldas) - Junct E 833 Griftu (A14) Road

NCA 5, 6 or 7

PWD North Eastern Region 30,717,610.84
 125

KeNHA/R10/215/2021

Routine Maintenance and Spot Improvement of Wajir - B93Dif (A14) Road

NCA 5, 6 or 7

All North Eastern Region 21,883,217.30
 126

KeNHA/R10/216/2021

Routine Maintenance and Spot Improvement of Junction balambala (A13) – Garbatula (A10) Road

NCA 6, 7 or 8

Youth North Eastern Region 15,141,028.76
 127

KeNHA/R10/217/2021

Routine Maintenance and Spot Improvement of JunctA3 Modika – Bura (A10) Road

NCA 6, 7 or 8

All North Eastern Region 15,987,735.96
 128

KeNHA/R10/218/2021

Routine Maintenance and Spot Improvement of Bura – Ijara (A10) Road

NCA 6, 7 or 8

Women North Eastern Region 10,444,327.96
 129

KeNHA/R10/219/2021

Routine Maintenance and Spot Improvement of A14 Griftu - Aternawar   (B80) Road

NCA 6, 7 or 8

All North Eastern Region 17,585,478.20
130 

KeNHA/R10/220/2021

Routine Maintenance and Spot Improvement of Wajir – Hadado (B82) Road

NCA 6, 7 or 8

Youth North Eastern Region 17,010,211.00
 131

KeNHA/R10/221/2021

Routine Maintenance and Spot Improvement of Bangali – Danyer (B83) Road

NCA 6, 7 or 8

Youth North Eastern Region 18,196,844.60
 132

KeNHA/R10/222/2021

Routine Maintenance and Spot Improvement of A13 Wajir - B93 Wajir Bor- Gerille (B96) Road

NCA 6, 7 or 8

women North Eastern Region 19,148,271.96
133 

KeNHA/R10/223/2021

Addendum No. 1

Clarification No. 1

Construction of Bilbil Bridge along Madogo Hola (B89) Road NCA 1, 2 or 3 All North Eastern Region

354,042,009.35

 134

KeNHA/R5/161/2021

Clarification No. 1

Framework Contract for Handling Emergencies on Museum hill –James Gichuru (A8) Road NCA 4,5 or 6 All CORR. A 88,674,800

KeNHA-Nairobi Regional Office, Ministry of Works Offices

Machakos Road

P.O. Box 200-00507

Nairobi

Email:

This email address is being protected from spambots. You need JavaScript enabled to view it.

 135

KeNHA/R8/255/2021

Performance Based Contract for Maintenance of Sultan Hamud - Makindu (A8) Road

NCA 1, 2 or 3

All CORR. A 324,025,207.00

KeNHA, Lower Eastern Regional Office, P.O. Box 2603-90100, MACHAKOS, Opposite Machakos School
044-2020287
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.

 136

 

KeNHA/R8/256/2021

Performance Based Contract for Maintenance of Makindu - Mtito Andei (A8) Road NCA 1, 2 or 3 All

 

 

 

 

CORR. A

338,086,350.00
 137

 

KeNHA/R9/84/2021

Addendum No. 1

Addendum No. 2

Addendum No. 5

Clarification No. 2

Performance Based Contract for Maintenance of Bachuma Gate - Maji ya Chumvi (A8) Road NCA 2, 3 or 4 All

 

CORR. A

233,408,802.86

KeNHA, Coast Region, 2nd Floor, MOR&PW Main Building, Mahindi Road off Shimanzi Road P.O. Box 84254-80100 Mombasa
020-2653702/30700344891 Email:This email address is being protected from spambots. You need JavaScript enabled to view it.

 138

 

KeNHA/R9/85/2021

Clarification No. 2

Performance Based Contract for Maintenance of Maji ya Chumvi - Mariakani (A8) Road

NCA 3, 4 or 5

PWD

 

 

CORR. A

104,203,583.00
 139

KeNHA/R7/503/2021

Addendum No. 1

Performance Based Contract for Maintenance of Isiolo – Kirish (A2) Road NCA 2, 3 or 4 All Corr. C

274,433,003.73

KeNHA Upper Eastern Regional Offices,

P.O. Box 325 – 60300, Isiolo, Isiolo Town

This email address is being protected from spambots. You need JavaScript enabled to view it.

 140

KeNHA/R7/504/2021

Addendum No. 1

Performance Based Contract for Maintenance of Kirish - Merrile River (A2) Road NCA 2, 3 or 4 All Corr. C

 282,084,317.30

 

 

No. TENDER NO. TENDER DESCRIPTION TENDER DOWNLOADS SUBMISSION DATE
1 KeNHA/2449/2021 Emergency Works at Nyando Bridge along Awasi – Nandi Hills at KM 4+800 (B8) Road Tuesday, 20th July, 2021  at 1100Hrs.

 

- All interested Bidders are required to continually check the Kenya National Highways Authority Website: www.kenha.co.ke for any Tender addendum or clarifications that may arise before submission date.

  

 



1479988088 location pin logo social media

Find Us At;Barabara Plaza, Off Airport South Road, Opp. KCAA HQs.

Let's go social

fb1   twitter1   1478812163 social square google plus1   1478812150 social youtube square1   1478812020 Instagram   1478812106 social linkedin square1  

News letter

This module can not work without the AcyMailing Component