Staff Mail       |     Intranet

config

MULTINATIONAL: BAGAMOYO – HOROHORO/LUNGALUNGA – MALINDI ROAD PROJECT

PHASE 2: KILIFI-MALINDI (A7) ROAD (INCLUDING MALINDI BYPASS) &

MOMBASA (LIKONI) – LUNGA LUNGA (A7) ROAD

Phase 2: Consultancy Services for the Review of the Feasibility Study, Environmental, Social Impact Assessment, Resettlement Action Plan and Detailed Engineering Design of Multinational Malindi -Lunga Lunga - Tanga - Bagamoyo Road Corridor Development Project: Mombasa(Likoni) - Lunga Lunga (A7) Section(101 km) & Kilifi- Malindi (A7) Section (48km) starting from Kilifi Bridge to Sabaki River Bridge including Malindi Bypass(12km).

Name of Firm:*
Phone Number:*
Email:*
Upload a File (Max 100Mbs):*


1479988088 location pin logo social media

Find Us At;Barabara Plaza, Off Airport South Road, Opp. KCAA HQs.

Let's go social

fb1   twitter1   1478812163 social square google plus1   1478812150 social youtube square1   1478812020 Instagram   1478812106 social linkedin square1  

News letter

This module can not work without the AcyMailing Component