Ref No. | Project Name / Activity | Road Length (Km) | Proposed Target Output (Lane Km) 2019-2020 | Interventions | County Traversed | Contractor |
---|---|---|---|---|---|---|
Central Region | ||||||
1 | Spot Improvement of Ndundori-Njambini (B20) Road | 100 | 20 | Bush clearing, Earthworks, Excavation and filling for structures, Culvert and drainage works, Passage of traffic, Shoulder maintenance and repairs, Base & Subbase repair, Cement and lime treated Subgrade, Subbase & Base, Bituminous Surface treatment & Surface dressing, Pothole patching, Road furniture repair and maintenance, HIV/AIDS prevention and awareness campaign | Nyandarua/ Nakuru | Kiu Construction Co. Ltd |
2 | Periodic Maintenance of B25: Sagana – Kagio – Kianjiru Road | 23 | 34 | Bush clearing, Earthworks, Excavation and filling for structures, Culvert and drainage works, Shoulder maintenance and repairs, Base repair, Bituminous Surface treatment & Surface dressing, Pothole patching, Road furniture repair and maintenance | Kirinyaga | Cementers Ltd |
3 | Periodic Maintenance of Jn A2 Makutano – Jn A9 Embu (B24) Road | 42 | 24 | Bush clearing, Excavation and filling for structures, Culvert and drainage works, Passage of traffic, Shoulder maintenance and repairs, Base repair, Cement and lime treated Subgrade, Subbase & Base, Bituminous Surface treatment & Surface dressing, Pothole patching, Road furniture repair and maintenance | Kirinyaga/ Embu | Samar Construction Co. Ltd |
4 | Periodic Maintenance of Jn B24 Embu – Jn B65 Meru (A9) Road | 94 | 136 | Bush clearing, Excavation and filling for structures, Culvert and drainage works, Passage of traffic, Shoulder maintenance and repairs, Base repair, Cement and lime treated Subgrade, Subbase & Base, Bituminous Surface treatment & Surface dressing, Pothole patching, Road furniture repair and maintenance | Embu, Tharaka Nithi & Meru | Pinnie Agencies Ltd |
Coast Region | ||||||
1 | Lunga Lunga - Ukunda | 75.5 | 31 | Shoulder reinstatement, sectional road base repairs, surface dressing, installation of drainage structures and site clearance | #REF! | #REF! |
2 | Saba Saba - Malindi | 124 | 88 | Shoulder reinstatement, sectional road base repairs, surface dressing, installation of road furniture, site clearance and installation of drainage structures | #REF! | #REF! |
Lower Eastern Region |
Showing 1 to 10 of 21 entries